Road closures in south Cumbria

The latest expected works list, with notes from National Highways, shows that five closures already in place are expected to carry on this week: o A590, from 8pm August 16 to 6am December 9, slight delays (under 10 minutes): A590 eastbound and westbound, Greenodd Roundabout, traffic signals for Speed limit signage and average speed camera installation. o A590, from 9pm November 6 to 6am December 16, slight delays (under 10 minutes): A590 westbound, Ulverston[1] to Swarthmoor, traffic signals and Lane closure for Reconstruction of retaining wall.

o M6, from 9.30am November 13 to 6am December 19, slight delays (under 10 minutes): M6 northbound and southbound, junction 37 to 38, Lane closures for tree removal and re-planting. o A590, from 9.30am November 24 2023 to 6 am March 27 2024, slight delays (under 10 minutes): M6 northbound and southbound, junction 34 to 37, Lane closures and slip road closure for tree removal and re-planting. o A590, from 7.30am November 28 to 5pm November 30, slight delays (under 10 minutes): A590 eastbound and westbound, Ulverston road, traffic signals for SU works (UU).

And a further two closures will begin soon: o A590, from 7pm December 4 to 5am December 7, slight delays (under 10 minutes): A590 eastbound and westbound, Ulverston to Gilpin Bridge, traffic signals for survey and inspection works. o A590, from 7am December 6 to 7pm December 12, slight delays (under 10 minutes): A590 eastbound and westbound, Newby bridge, traffic signals for SU works (ENW).

National Highways is responsible for maintaining motorways and major A-roads, so closures of smaller roads will not be included in their schedule.

References

  1. ^ Ulverston (www.thewestmorlandgazette.co.uk)